Quantcast
Channel: Fortinet Cookbook
Viewing all articles
Browse latest Browse all 690

Installing Flush Mount Rails into a 2 Post Rack

$
0
0

Installing Flush Mount Rails into a 2 Post Rack

  1. Place the two mounting rails on a smooth work surface with the front ends of both rails facing you.
  2. Remove the two bracket nuts from the adjustable mounting bracket using an appropriate wrench or nut-driver.
  3. Place the mounting bracket on either the 7.62cm or 15.24cm (3in or 6in) wide flush-mount threaded studs.
  4. Finger tighten the previously removed bracket nuts to secure the mounting bracket.
  5. Repeat steps 2 to 4 for the remaining mounting rail.
  6. Holding the left mounting rail at the required location, position the mounting flange against the front of the 2-post rack and secure it to the rack with two of the provided screws.
  7. Slide the adjustable mounting flange so that it is against the back of the rack post, then secure it to the post with two of the provided screws.
  8. Repeat steps 6 and 7 to install the right mounting rail.
  9. Confirm that both rails are mounted at the same vertical position on both sides of the rack.
  10. Tighten the bracket nuts on the adjustable mounting bracket using an appropriate wrench or nut-driver.

If you have Center Mount Rails, see Installing Center Mount Rails into a 2 Post Rack.

  • Was this helpful?
  • Yes   No

The post Installing Flush Mount Rails into a 2 Post Rack appeared first on Fortinet Cookbook.


Viewing all articles
Browse latest Browse all 690

Trending Articles